Grounding Requirements Near Type D FIBCs

What can we help you with?

national simple

Technical flooring, delivered directly

  • ESD flooring, urethane cement, terrazzo, and polished concrete
  • In-house W-2 installation crews and experienced field leadership
  • National service coverage with project-specific staffing plans
  • Testing, documentation, and defined project closeout
  • Dedicated support for corporate procurement and multi-site contracting

Phone: +1 (844) 687-1961

Email: projects@craftsmanconcretefloors.com

Our Clients

Type D FIBC Charge Control

TRGS 727 requires all people and conductive objects near a Type D flexible intermediate bulk container (FIBC) that can become dangerously charged to be grounded when flammable gases, vapors, or dusts are present. The bag’s lack of grounding devices does not remove this requirement.

This requirement appears in section 6.6(6) of TRGS 727, the German technical rule on preventing ignition hazards from electrostatic charges, January 2016 edition corrected July 2016. It forms part of the broader FIBC selection and grounding requirements.

How Type D controls charge

Source
TRGS 727, Annex C
Devices
No grounding devices

Annex C of TRGS 727 describes Type D FIBCs as limiting charging to a non-hazardous level through corona discharge. It also states that Type D FIBCs have no grounding devices.

When a Type D FIBC is used, Annex C requires proof that no dangerous charging occurs.

Frequently Asked Questions

Yes. TRGS 727 requires grounding of all nearby people and conductive objects that can become dangerously charged when flammable gases, vapors, or dusts are present. The Type D bag’s lack of grounding devices does not remove this requirement.

TRGS 727 Annex C describes Type D FIBCs as limiting charging to a non-hazardous level through corona discharge. It also requires proof, when a Type D FIBC is used, that dangerous charging does not occur.

Blog

Craftsman Publishes 2026–2027 ESD Flooring Technical Guide
Craftsman’s 2026–2027 ESD flooring technical guide brings together more than 70 resources on installation, field testing, acceptance criteria and closeout documentation.
ESD Epoxy Flooring Case Study: 34,000 SF Dallas, TX
• Tier-1 electronics QA environment • 34,000 SF ESD epoxy flooring • Phased work in occupied space • Verification + closeout documentation
ESD Epoxy Flooring Case Study: 67,000 SF | Houston, TX
• Tier-1 electronics manufacturing / QA (ESD-controlled) • 67,000 SF ESD epoxy flooring • Product-cycle reconfiguration program • Phased install; moisture + resistance testing; closeout docs