DoD and Army clearance requirements for conductive-floor testing

What can we help you with?

national simple

Technical flooring, delivered directly

  • ESD flooring, urethane cement, terrazzo, and polished concrete
  • In-house W-2 installation crews and experienced field leadership
  • National service coverage with project-specific staffing plans
  • Testing, documentation, and defined project closeout
  • Dedicated support for corporate procurement and multi-site contracting

Phone: +1 (844) 687-1961

Email: projects@craftsmanconcretefloors.com

Our Clients

When Floor Testing May Proceed

Under DoD Manual 4145.26 and DA Pam 385-64, electrical testing of a conductive floor may proceed only when the room or area is free of exposed explosives and flammable gas mixtures.

DoD Manual 4145.26: conductive floors and tabletops

Clause
C6.4.7.5.5
Edition
13 Mar 2008, Change 2

Paragraph C6.4.7.5.5 requires resistance testing of conductive floors and tabletops to proceed only when the room or area is free from exposed explosives and flammable gas mixtures.

This requirement comes from the DoD Contractor’s Safety Manual for Ammunition and Explosives, dated 13 March 2008 and incorporating Change 2 of 31 August 2018. See the DoD conductive-floor guide for the broader testing requirements.

DA Pam 385-64: conductive floors

Edition
24 July 2023

DA Pam 385-64 states that electrical tests of conductive floors will be conducted only when the room or area is free of exposed explosives and/or flammable gas mixtures.

This provision appears in the conductive-floor testing requirements of the Army’s Ammunition and Explosives Safety Standards, dated 24 July 2023.

Frequently asked questions

DoD Manual 4145.26 (13 March 2008, incorporating Change 2 of 31 August 2018) requires the room or area to be free from exposed explosives and flammable gas mixtures before conductive-floor resistance testing proceeds. DA Pam 385-64 (24 July 2023) requires the room or area to be free of exposed explosives and/or flammable gas mixtures before electrical tests of conductive floors are conducted.

Yes. DoD Manual 4145.26 (13 March 2008, incorporating Change 2 of 31 August 2018), paragraph C6.4.7.5.5, applies the condition to resistance testing of conductive floors and tabletops: testing shall proceed only when the room or area is free from exposed explosives and flammable gas mixtures.

Blog

Craftsman Publishes 2026–2027 ESD Flooring Technical Guide
Craftsman’s 2026–2027 ESD flooring technical guide brings together more than 70 resources on installation, field testing, acceptance criteria and closeout documentation.
ESD Epoxy Flooring Case Study: 34,000 SF Dallas, TX
• Tier-1 electronics QA environment • 34,000 SF ESD epoxy flooring • Phased work in occupied space • Verification + closeout documentation
ESD Epoxy Flooring Case Study: 67,000 SF | Houston, TX
• Tier-1 electronics manufacturing / QA (ESD-controlled) • 67,000 SF ESD epoxy flooring • Product-cycle reconfiguration program • Phased install; moisture + resistance testing; closeout docs