Under-15 V Claims on ESD Flooring Data Sheets: Which Footwear Is Covered?

What can we help you with?

national simple

Technical flooring, delivered directly

  • ESD flooring, urethane cement, terrazzo, and polished concrete
  • In-house W-2 installation crews and experienced field leadership
  • National service coverage with project-specific staffing plans
  • Testing, documentation, and defined project closeout
  • Dedicated support for corporate procurement and multi-site contracting

Phone: +1 (844) 687-1961

Email: projects@craftsmanconcretefloors.com

Our Clients

Under-15 V Body-Voltage Claims

A supplier’s under-15 V body-voltage claim on an ESD flooring data sheet applies to the footwear conditions stated on that sheet. It does not establish the same result with ordinary shoes or every footwear type used in a facility.

Craftsman Concrete is an authorized installer of Sherwin-Williams High Performance Flooring, PIP and Sika ESD flooring systems. We help facilities review manufacturer data sheets and supporting test documentation, coordinate applicable manufacturer warranties, and determine whether additional footwear/flooring system testing is needed.

Before relying on the advertised figure, identify the footwear types the facility will use and determine whether the supplier’s supporting evidence applies to those footwear and flooring combinations.

Which footwear do the supplier claims specify?

Conductive or ESD-compliant footwear. Each of the following data sheets states its body-voltage figure together with a footwear condition.

Data sheetStated body-voltage figureStated footwear condition
PIP 200 ESD Conductive URBody voltage generation below 15 VConductive footwear
PIP 100 ESD HBBody voltage generation below 15 VConductive footwear
Sikafloor-200 ESDBody voltage generation under 15 V per ANSI/ESD 97.2, as written on the sheetESD-compliant footwear
Sikafloor-2350 ESD NABody voltage generation under 15 V per ANSI/ESD 97.2, as written on the sheetESD-compliant footwear

The figure describes performance with the stated footwear condition, rather than the floor alone.

What must the facility establish?

Qualification applies to each footwear and flooring type combination. For a footwear/flooring system used for personnel grounding, ANSI/ESD S20.20-2021 requires qualification of each footwear and flooring type combination used by the organization. Both Table 2 limits must be met:

A supplier’s under-15 V figure is numerically below the body-voltage limit, but the supporting evidence must apply to the combination being qualified and the required test conditions. It also does not supply the separate system-resistance result.

The S20.20 footwear/flooring qualification requirements explain how the two tests apply.

Identify the footwear before requesting supporting evidence. List the footwear types intended for use with each flooring type. Request supporting documentation identifying the tested combinations, test methods, results, applicable limits and environmental conditioning.

A broad description such as “conductive footwear” or “ESD-compliant footwear” does not identify the particular footwear type tested. The facility’s ESD program team needs enough information to determine whether the evidence covers the combinations it intends to use.

Craftsman’s testing and closeout documentation distinguishes floor-resistance reports from separately assigned footwear/flooring system-resistance and walking-body-voltage reports.

Frequently Asked Questions

No. The cited PIP data sheets specify conductive footwear, and the cited Sika sheets specify ESD-compliant footwear. Their under-15 V statements do not establish that result with ordinary shoes.

The cited S20.20-2021 requirement applies to each footwear and flooring type combination used by the organization. It does not state that every individual pair requires separate product qualification. Routine footwear and flooring verification remains a separate part of the facility’s ESD program.

Request the footwear type used in the test, the measured results and the test conditions. Compare that information with the footwear and flooring combinations planned for the facility before relying on the advertised body-voltage figure.

Case Studies

Craftsman Publishes 2026–2027 ESD Flooring Technical Guide
Craftsman’s 2026–2027 ESD flooring technical guide brings together more than 70 resources on installation, field testing, acceptance criteria and closeout documentation.
ESD Epoxy Flooring Case Study: 34,000 SF Dallas, TX
• Tier-1 electronics QA environment • 34,000 SF ESD epoxy flooring • Phased work in occupied space • Verification + closeout documentation
ESD Epoxy Flooring Case Study: 67,000 SF | Houston, TX
• Tier-1 electronics manufacturing / QA (ESD-controlled) • 67,000 SF ESD epoxy flooring • Product-cycle reconfiguration program • Phased install; moisture + resistance testing; closeout docs