ESD Floor Testing Services

What can we help you with?

national simple

Technical flooring, delivered directly

  • ESD flooring, urethane cement, terrazzo, and polished concrete
  • In-house W-2 installation crews and experienced field leadership
  • National service coverage with project-specific staffing plans
  • Testing, documentation, and defined project closeout
  • Dedicated support for corporate procurement and multi-site contracting

Phone: +1 (844) 687-1961

Email: projects@craftsmanconcretefloors.com

Our Clients

ESD Floor Testing at a Glance

Craftsman Concrete Floors runs ESD floor testing services nationwide for facilities that must show their static-control floors still meet the limits in their ANSI/ESD S20.20-2021 program. S20.20-2021 requires a compliance verification plan that identifies which ESD control items are tested and how often (section 7.4), so a floor in the program needs documented periodic results, not just a reading at handover. We test floors installed by Craftsman and by other contractors.

ItemCraftsman ESD floor testing
ServicePeriodic ESD floor compliance verification, test records for S20.20 certification and recertification audits, and drift diagnosis on floors installed by Craftsman and by other contractors
Test methodsANSI/ESD STM7.1-2020 floor resistance, point to point and to ground
ANSI/ESD STM97.1-2025 person–footwear–floor system resistance
ANSI/ESD STM97.2-2016 walking body voltage (S20.20-2021 limit: below 100 V)
ASTM F150-25; IEC 61340-5-1:2024 programs
Resistance rangesConductive below 1.0 × 106 ohms; static dissipative at or above 1.0 × 106 and below 1.0 × 109 ohms. The facility program or specification sets which range applies (conductive vs dissipative).
Retest intervalSet by the facility’s compliance verification plan; S20.20-2021 sets no numerical floor-retest interval (retest intervals)
DocumentationFloor-plan-mapped readings, meter calibration records, technician sign-off, and a closeout package for the audit binder
CoverageIn-house W-2 crews provide national service coverage; installing industrial floors since 1999

Whatever the retest interval, the deliverable reads the same: point-by-point results against the range the program specifies, with a pass/fail disposition a quality lead can hand straight to an auditor.

What an S20.20 Verification Visit Measures

A verification visit produces data an auditor can act on, which means the measurement discipline matters as much as the numbers. Test points are laid out on the floor plan before the first reading. Meters carry current calibration certificates, and each result records point location, ambient temperature, relative humidity, and the technician who took it. The standards themselves are explained on our ESD compliance standards page; this page covers the service of testing floors to them.

STM7.1 Resistance to Ground and Point to Point

STM7.1-2020 acceptance testing measures the installed floor’s resistance to ground and point to point, with a minimum number of tests for each. Conductive floors are specified below 1.0 × 106 ohms and static dissipative floors at or above 1.0 × 106 and below 1.0 × 109 ohms. Which range your program requires is a selection question, answered on our conductive vs dissipative page, not a testing question.

What testing establishes is whether the floor still sits inside the range your S20.20 program specifies, point by point, with drift visible in the data before it becomes an audit finding. A floor can pass on average and fail at the points nearest a corroded ground strap, which is why mapped readings matter more than an average.

STM97.1 System Resistance and STM97.2 Body Voltage

Floor resistance alone does not prove the system works with people on it. STM97.1 measures resistance through the full person–footwear–floor path, and STM97.2 measures the body voltage a person generates walking on the floor. S20.20-2021 requires a footwear/flooring system used for personnel grounding to stay below 100 volts and below 1.0 × 109 ohms system resistance (qualification limits), and a passing floor paired with the wrong footwear can still fail.

When the scope includes these tests, we run them with the footwear your program specifies, so a failed reading points at the actual fault instead of restarting the footwear-versus-floor argument from zero.

Test-Point Mapping and Calibration Records

Every reading is tied to a numbered location on your floor plan, so the next verification cycle measures the same points and drift becomes a trend line instead of an anecdote. Meter calibration certificates travel with the data, and the technician who took the readings signs the record. The assembled package is built for the binder an auditor actually opens: the numbered readings, the floor plan, calibration records, and the pass/fail disposition.

Why Installed ESD Floors Drift Out of Spec

Installed ESD floors drift out of specification for reasons the original installer never sees. Mapped readings show which mechanism is at work, and each carries a different fix.

Grounding Faults

A floor can hold its material resistance and still fail verification because the path to ground is broken. Strap corrosion or a tie-in severed during another trade’s work reads the same way in the data: points near the fault spike while the rest of the floor passes. We trace faults to the physical strap or tie-in rather than reporting a bare number, because a grounding repair is a much smaller scope than a recoat.

Traffic-Lane Wear

Forklift lanes and cart paths thin the conductive topcoat well before the field of the floor shows wear. Resistance in the lanes drifts upward while everything else passes, and a whole-floor average hides it. Mapped readings catch lane drift early enough that a lane recoat, rather than full replacement, is still on the table. Once wear reaches the ground plane, the conversation changes, and we will tell you which side of that line your floor is on.

Verification and Recertification Audit Support

Compliance verification turns test data into a program deliverable. Floor verification runs on the interval your compliance verification plan sets, while audit support compresses to whatever date a customer review or S20.20 recertification audit puts on the calendar. When a point fails, the finding routes into a corrective scope the same company executes, so nothing is lost translating between a testing vendor and a flooring contractor.

Testing Floors Installed by Other Contractors

We test floors installed by Craftsman and by other contractors. Verifying an installed ESD floor against an S20.20 program does not require the original installer. Testing a floor with no baseline data starts by establishing the test-point map and a baseline set of readings; every visit after that measures drift against it.

If the floor’s test records lapsed or were never formalized, the same visit produces its compliance verification record, current as of the test date. Product qualification records for each footwear/flooring combination are a separate S20.20-2021 requirement (footwear/flooring qualification).

Audit-Binder Documentation

When ESD flooring auditors or a customer’s quality team schedule a program review, the floor section of the binder either exists or it does not. Our closeout package is built to be that section. Mapped STM7.1 readings referenced to floor-plan locations, STM97.1 and STM97.2 results with the footwear pairing recorded (when those tests are in scope), meter calibration certificates, and technician sign-off arrive assembled, not as raw data your team has to format the week before the audit.

When a Floor Fails Testing

A failed reading is the start of a diagnosis, and many failures never reach replacement. Grounding faults resolve at the strap or tie-in. Wear failures scale from a lane recoat up to full replacement, with pricing that depends on system type, thickness, and substrate condition (ESD flooring cost). Because our in-house ESD flooring installation crews perform the corrective work themselves, the test data feeds the repair scope directly. Replacement options and system selection live on our ESD flooring hub.

Frequently Asked Questions

A visit measures floor resistance point to point and to ground per ANSI/ESD STM7.1-2020 at mapped floor-plan points. When the scope includes system testing, it adds person–footwear–floor resistance per STM97.1-2025 and walking body voltage per STM97.2-2016. Results ship with meter calibration records and technician sign-off in a closeout package assembled for the audit binder.

As often as the facility’s compliance verification plan requires. ANSI/ESD S20.20-2021 section 7.4 requires that plan to identify what is tested periodically and how often, but it does not set a numerical floor-retest interval. ESD TR53-01-22 supplies the compliance verification procedures, and its foreword recommends basing intervals on how critical the items are to the ESD control program.

Testing is quoted per facility from square footage and test-point count, so ask for a scoped number rather than a rate card. If testing shows a floor needs replacement, pricing depends on system type, thickness, and substrate condition. Grounding faults can often be repaired at the strap or tie-in without touching the coating.

Yes. We test floors installed by Craftsman and by other contractors; verifying an installed floor against an S20.20 program does not depend on who installed it. The first visit establishes the test-point map and baseline, and later visits measure drift against it, which is what turns readings into a defensible trend for an auditor.

The floor usually changed less than its conditions did. Corroded ground straps and tie-ins cut during other trades’ work break the path to ground, and traffic lanes wear the conductive layer faster than the rest of the floor. Mapped readings show which mechanism is at work, and each carries a different fix, from a strap repair to a lane recoat.

After the cure time the flooring manufacturer specifies. ANSI/ESD STM7.1-2020 section 6.2 directs testers to follow the manufacturer’s cure instructions before acceptance testing, and readings taken before full cure can differ from later ones. Some systems also require checks between coats, and some project specifications set their own window. For phased corrective work, each zone tests on its own cure schedule, so live areas keep their current verification records while repairs proceed.

ANSI/ESD S20.20-2021 is the program standard, with ANSI/ESD STM7.1-2020 covering flooring-system resistance and the ANSI/ESD STM97.1-2025 and STM97.2-2016 pair covering system resistance and body-voltage generation with a person in the loop. ASTM F150-25 and IEC 61340-5-1:2024 appear in many program documents as well. Each document and its current edition are covered on our ESD compliance standards page; this page is the service of testing floors to them.

In-house W-2 crews provide national service coverage, and we have installed industrial floors since 1999, so verification visits schedule the same way in any region. Multi-site programs can run on one test-point mapping convention, which keeps the binders consistent across facilities.

ESD Flooring Knowledge Center

Case Studies

Craftsman Publishes 2026–2027 ESD Flooring Technical Guide
Craftsman’s 2026–2027 ESD flooring technical guide brings together more than 70 resources on installation, field testing, acceptance criteria and closeout documentation.
ESD Epoxy Flooring Case Study: 34,000 SF Dallas, TX
• Tier-1 electronics QA environment • 34,000 SF ESD epoxy flooring • Phased work in occupied space • Verification + closeout documentation
ESD Epoxy Flooring Case Study: 67,000 SF | Houston, TX
• Tier-1 electronics manufacturing / QA (ESD-controlled) • 67,000 SF ESD epoxy flooring • Product-cycle reconfiguration program • Phased install; moisture + resistance testing; closeout docs